PACK Projects
At PACK Power, we’re the epitome of reliability and excellence in the energy sector. Our highly technical team offers nationwide solutions for high-voltage needs, emphasizing safety-driven construction and services. Our comprehensive approach ensures meticulous planning and execution for optimal performance and longevity.
Our Projects
Provided emergency High Voltage and Medium Voltage procurement solutions for client to meet a critical outage date.
Support client on emergency and long-term procurement solutions throughout multiple projects to meet their completion deadlines.
Construction of 35 kV Overhead Interconnection Facility in Virginia. Work consisted of setting poles, stringing conductor, foundation work, control enclosure terminations, and installation of 35 kV equipment.
Construction of 35 kV Overhead Interconnection Facility in Virginia. Work consisted of setting poles, stringing conductor, foundation work, control enclosure terminations, and installation of 35 kV equipment.
Medium Voltage Collection System on a Solar project in New Mexico. This included supply and installation of junction boxes, 35 kV terminations, testing support, commissioning support, and DC cable stringing and terminations.
A temporary substation solution was needed to energize a new addition to an existing Wind Project. The scope included trenching in and terminating the new collection system to existing risers in the existing substation along with a modification of utility metering cabinet, and various other activities to support energization and testing.
Installation of a 34.5kV collection system including MV cable supply, installation, and termination, inverter and junction box installation, and associated conduit and grounding to support 100 MWAC.
Contracted to provide engineering, procurement, and construction services for a 345kV:34.5kV substation project to support a large 200+ MWAC Solar + BESS project in New Mexico. Execution included an innovative and new-to-the-market high-voltage circuit breaker solution to meet an aggressive schedule.
Installation of 35 kV Collection System to support 19 Turbine Repower Wind Projects in Wyoming, including MV and LV cable installation and termination, transformer and junction box installation, and MET/ADLS electrical installations.
Contracted to provide engineering, procurement, and construction services for a 69kV:34.5kV substation project in Iowa to support a 24 MWAC Solar project.
Installation of the foundations and electrical scopes to support 280MW/1120MWhr BESS Project in Nevada. Execution included a quick mobilization to meet a challenging timeline.
Construction of 35 kV Overhead Interconnection Facility in Virginia. Work consisted of setting poles, stringing conductor, foundation work, control enclosure terminations, and installation of 35 kV equipment.
Contracted to provide engineering, procurement, and construction services for a 230kV:34.5kV substation project in Virginia to support a 60 MWAC Solar project.
Contracted to provide procurement and construction services for a 115kV:34.5kV substation project in Alabama to support a 80 MWAC Solar project.